Repo Dosen ULM

“Perancangan Sistem Pengukuran Kinerja Pada Jurusan Teknik MesinUniversitas Udayana Menggunakan Metode Performance Prism”

Show simple item record

dc.creator Budiana Penindra, I Made Dwi
dc.creator Priyantha Wedagama, Dewa Made
dc.date 2015-10-07
dc.date.accessioned 2020-06-15T03:56:44Z
dc.date.available 2020-06-15T03:56:44Z
dc.identifier http://eprints.ulm.ac.id/832/1/TI-07.pdf
dc.identifier Budiana Penindra, I Made Dwi and Priyantha Wedagama, Dewa Made (2015) “Perancangan Sistem Pengukuran Kinerja Pada Jurusan Teknik MesinUniversitas Udayana Menggunakan Metode Performance Prism”. In: Seminar Nasional Tahunan Teknik Mesin Indonesia XIV, 7-8 OKTOBER 2015, BANJARMASIN.
dc.identifier.uri https://repo-dosen.ulm.ac.id//handle/123456789/9475
dc.description Udayana University Department of Mechanical Engineering is one of the departments that have A point on its accreditation at the University of Udayana. To maintain the value of A is not easy, so the Department should continue to monitor the performance achieved through performance measurement system. Based on that fact, it is necessary to analysis, design and implementation of performance measurement system in the Department of Mechanical Engineering University of Udayana using Performance Prism method wherein the method will be integrated with several methods of Integrated Performance Measurement System (IPMS) in determining Key Performance Indicator (KPI) then scored using Hierarcy Analytical Process (AHP). Once the KPI has the score and then conducted a thorough scoring with Objectives Method Matrix (OMAX) so that the resulting indices per period is the reference level of performance majors, as well as the Traffic Light System (TLS) to determine which ones need improvement KPI based on color. From the results of research through the Performance Prism approach method identified 60 stakeholder requirements and contributions are the basis for determining the 21 Key Performance Indicator (KPI). From the results of research through the Performance Prism approach method identified 60 stakeholder requirements and contributions are the basis for determining the 21 Key Performance Indicator (KPI). Performance indicators experienced a rising trend from period to period even bizarre 12-13 fulfilled except in the period which decreased 11.64% from the previous period. Achievement of performance at odd periods of 12-13 and even 12-13 has a below-average performance of 300 which respectively reached 244.74 and 216.25. There are several KPIs that have red light (Traffic Light System) which means that needs special attention by the Department, namely: KPI 7, KPI 8 and IBC 15. Kata Kunci : Performance measurement system, Performance Prism, Integrated Performance Measurement Systems (IPMS), Key Performance Indicator (KPI), Analytic Hierarcy Process (AHP) method, Objectives Matrix (OMAX) method.
dc.format text
dc.relation http://eprints.ulm.ac.id/832/
dc.subject TJ Mechanical engineering and machinery
dc.title “Perancangan Sistem Pengukuran Kinerja Pada Jurusan Teknik MesinUniversitas Udayana Menggunakan Metode Performance Prism”
dc.type Conference or Workshop Item
dc.type PeerReviewed


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account