Repo Dosen ULM

Turnitin-Measuring The Use of Detention Basin as Flood Control System at Campus I Lambung Mangkurat University Banjarmasin, Indonesia

Show simple item record

dc.contributor.author Amalia, Maya
dc.contributor.author Muchamad, Bani Noor
dc.contributor.author Sutanti, Maulidyya Putri
dc.contributor.author Sofia, Elma
dc.contributor.author Helda, Noordiah
dc.date.accessioned 2024-08-06T06:19:52Z
dc.date.available 2024-08-06T06:19:52Z
dc.date.issued 2023-06
dc.identifier.uri https://repo-dosen.ulm.ac.id//handle/123456789/35787
dc.description.abstract South Kalimantan Province has experienced floods during the rainy seasons due to high intensity of precipitation. In mid-January 2021, flood inundated the Banjarmasin Campus I area of Lambung Mangkurat University (ULM Campus I). In mid-December 2021, other flood case inundated Campus I ULM. The research aims to measure the effectiveness of using detention basin as flood control in Banjarmasin campus area of ULM. Data collection is based on hydrological analysis of rain data to obtain a designed flood discharge with a return period of 20 years using the Der Weduwen method. The hydraulic analysis of the transverse and longitudinal sections on the river section of Campus I ULM was analyzed using the HEC-RAS. Based on the value of the flood volume, an analysis of the volume of the detention basin is carried out, where the volume of the detention basin must be greater than the volume of the flood. Spatial data is used to obtain contours using ArcGIS, to determine the optimal location of the detention basin. Based on the simulation, cumulative planned flood volume was 36,010 m3 with a discharge value of 89.30 m3/s. It was designed two detention basin. First detention basin dimension is 160 m x 130 m x 1.5 m located closed to General Building. The second one, located at Master of Law Building with dimension is 120 m x 35 m x 1.5 m First detention basin dimension is 160 m x 130 m x 1.5 m located closed to General Building. The second one, located at Master of Law Building with dimension is 120 m x 35 m x 1.5 m. en_US
dc.publisher IOP Conference Series: Earth and Environmental Science en_US
dc.subject Flood, Campus I ULM, HEC-RAS, Der Werduwen Method, Detention Basin en_US
dc.title Turnitin-Measuring The Use of Detention Basin as Flood Control System at Campus I Lambung Mangkurat University Banjarmasin, Indonesia en_US
dc.type Other en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account