Repo Dosen ULM

Analysis of Minimizing Iron Material Waste for Construction Work in Wetlands with Bar Bending Schedule Method

Show simple item record

dc.contributor.author Yuliana, Candra
dc.contributor.author Kartadipura, Retna H.
dc.contributor.author Supadi, Mutiara Nursalsadilla
dc.date.accessioned 2023-09-15T00:45:15Z
dc.date.available 2023-09-15T00:45:15Z
dc.date.issued 2023-08-31
dc.identifier.citation Candra Yuliana, Retna Hapsari Kartadipura, Mutiara Nursalsadilla S., Sherina Harti S. M., "Analysis of Minimizing Iron Material Waste for Construction Work in Wetlands with Bar Bending Schedule Method," SSRG International Journal of Civil Engineering, vol. 10, no. 8, pp. 1-9, 2023. Crossref, https://doi.org/10.14445/23488352/IJCE-V10I8P101 en_US
dc.identifier.issn 2348-8352
dc.identifier.uri https://repo-dosen.ulm.ac.id//handle/123456789/33325
dc.description.abstract The components of the material structure that are important in calculating requirements are iron requirements because iron requirements have a high value in construction work. Iron requirements such as reinforcing columns, beams, pile caps, sloofs, and others are widely used for reinforcement. The research aims to determine the need for stirrup reinforcement using a method based on field data with the Bar Bending Schedule (BBS) approach. The BBS method minimises the waste of material so that it only leaves the material in the screw-type iron reinforcement, around 14.79% for iron reinforcement with a diameter of 10 mm and 6.65% for iron reinforcement with a diameter of 16 mm. As well as for plain iron reinforcement, only leave material around 0.01% on mm diameter iron reinforcement. The bar bending schedule method can optimize the remaining material from the remaining length of the iron by reusing it for other iron piece plans where the piece’s dimensions can meet the previous rest en_US
dc.publisher Seventh Sense Research Group (SSRG) en_US
dc.subject Bar bending schedule, Leftover material, Stirrup reinforcement, The volume requirement. en_US
dc.title Analysis of Minimizing Iron Material Waste for Construction Work in Wetlands with Bar Bending Schedule Method en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account