Prevention Strategy Of The Delivery Of Construction Projects In Feces Mud Processing Infrastructure Development

Show simple item record

dc.contributor.author Prasetia, Irfan
dc.date.accessioned 2023-05-12T03:44:57Z
dc.date.available 2023-05-12T03:44:57Z
dc.date.issued 2019-08-20
dc.identifier.issn 2320-0847
dc.identifier.uri https://repo-dosen.ulm.ac.id//handle/123456789/30804
dc.description.abstract Fecal Treatment Plant (IPLT) is a wastewater treatment designed to only accept and treat sludge originating from local systems that are transported by means of transporting sludge. In the construction of the IPLT Infrastructure there was a delay in development that occurred in 3 places of the IPLT construction, namely the IPLT of Tanah Bumbu Regency, IPLT in the City of Banjarbaru, and the IPLT of the Tapin Regency. Of all the constraints that occurred in the IPLT, the duration of the work was separated from the planned construction of the IPLT infrastructure. The purpose of this study was to find out the factors that caused the delay in the IPLT development project and the prevention strategy of the project delay. In connection with these objectives, the study was conducted using questionnaires and interviews as a tool for collecting data distributed to respondents. Respondents were chosen from people who were directly involved in the construction of the IPLT. From the results of the analysis that has been conducted, it can be concluded that the factors causing delays in the IPLT infrastructure development project are caused by 6 variables. These factors are material (material), factors of skilled labor, equipment factors, project owners (PPK), technical factors of IPLT and environmental factors. From these factors, the prevention strategy of the delay in the IPLT project is good and progressive scheduling, good workforce organization, availability of equipment by contractors, the need for good coordination between government agencies and conducting re-surveys and conducting intensive supervision. en_US
dc.language.iso en en_US
dc.subject Research Subject Categories::TECHNOLOGY::Civil engineering and architecture en_US
dc.title Prevention Strategy Of The Delivery Of Construction Projects In Feces Mud Processing Infrastructure Development en_US
dc.type Article en_US