Repo Dosen ULM

Analisa Pengoperasian 1 Cwp Dan 2 Cwp Pada Cooling Water System Pltu Asam Asam Unit 4

Show simple item record

dc.contributor.author Eko Hartanto, Juni
dc.contributor.author Tamjidillah, Mastiadi
dc.date.accessioned 2023-05-09T23:50:58Z
dc.date.available 2023-05-09T23:50:58Z
dc.date.issued 2019-12-01
dc.identifier.issn 2655-903X
dc.identifier.uri https://repo-dosen.ulm.ac.id//handle/123456789/30600
dc.description Artikel en_US
dc.description.abstract Abstract Electric power is used to support daily life, therefore electrical energy must be continually developed considering the increasing need for this energy. Therefore it is necessary to do preventive, corrective maintenance and efforts to optimize the generating unit such as savings in the production process, one of which is by analyzing the operation of a Circulating Water Pump CWP at the Unit 4 Acid-Acid Power Plant. The formulation of the problem in this study is that in the manufacturer's design for 65 MW full load 2 CWP pumps are needed, this can be seen from the pump specification data, but in fact with only a Circulating Water Pump CWP can produce a full load of 65 MW. Keywords : Tara Calor, Thermal Efficiency, Net Power and Own Use, Vacuum Pressure and Main Steam Flow en_US
dc.publisher Program Studi Teknik Mesin Fakultas Teknik Universitas Lambung Mangkurat en_US
dc.relation.ispartofseries 4;2
dc.subject Research Subject Categories::TECHNOLOGY en_US
dc.title Analisa Pengoperasian 1 Cwp Dan 2 Cwp Pada Cooling Water System Pltu Asam Asam Unit 4 en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account