dc.description.abstract |
Abstract
Electric power is used to support daily life, therefore electrical energy must be
continually developed considering the increasing need for this energy. Therefore
it is necessary to do preventive, corrective maintenance and efforts to optimize
the generating unit such as savings in the production process, one of which is by
analyzing the operation of a Circulating Water Pump CWP at the Unit 4 Acid-Acid
Power Plant. The formulation of the problem in this study is that in the
manufacturer's design for 65 MW full load 2 CWP pumps are needed, this can be
seen from the pump specification data, but in fact with only a Circulating Water
Pump CWP can produce a full load of 65 MW.
Keywords : Tara Calor, Thermal Efficiency, Net Power and Own Use, Vacuum
Pressure and Main Steam Flow |
en_US |