dc.description.abstract |
ABSTRACT: Along with the need for major infrastructure, especially in the working area BBPJN XI
Banjarmasin, then BBPJN XI Banjarmasin need to cooperate with the Provider Consultant in Management
Consulting service activity form. Although aided by the availability of management consultants, the wide scope
of authority has the potential to overload performance for the volume and scope of activities is increasing.
The limited resources available, the constraints of the implementation of the more, the requirements of
increasingly widespread, space is increasingly limited, the problem of shortage of funds, timing and level of
professionalism implementers, problem effecting what is available, disciplinary problems, the level of accuracy,
and a variety of other issues that are challenges that must be addressed, accommodated, considered, arranged
and secured in its implementation.
From the analysis that has been done, it can be concluded that the lowest value indicator every aspect of the
performance needs attention because it shows the lowest index is an indicator of the ability of communication
and coordination, document management responsibilities indicator, an indicator of the presence discipline, and
indicators gather input. |
en_US |