Turnitin: Manajemen Risiko pada Proyek Gedung Bertingkat di Banjarmasin

Show simple item record

dc.contributor.author Yuliana, Candra
dc.contributor.author Hidayat, Gawit
dc.date.accessioned 2023-04-11T01:28:04Z
dc.date.available 2023-04-11T01:28:04Z
dc.date.issued 2017-12
dc.identifier.issn 2459-9964
dc.identifier.uri https://repo-dosen.ulm.ac.id//handle/123456789/28271
dc.description Turnitin en_US
dc.description.abstract Process of implementation of the high building construction usually takes a long time and complex so it can cause uncertainty and various risks. The purpose of the research are analysis of the significant risks and determine the response to significant risks. The research process is performed by survey. Data questionnaire analysis begins with risk identification through the study of literature, after it carried out a risk analysis conducted by distributing questionnaires to a number of respondents. Respondents are site manager, site engineer, logistics mechanics, team leader, supervising consultants. The risk analysis is done by estimating the likelihood that the biggest risk will occur and the resulting impact on costs and step time ast conduct risk response by way of interviews with selected respondents. Assessment of the risk by Severity Index and Probability Impact Grid. Based on the analysis found that the variable is a significant risk with respect to time, there are six kinds of risks as well as the response variable. While variable significant risks to cost, there are five kinds as well as its en_US
dc.publisher Universitas Lambung Mangkurat en_US
dc.subject Risks Management, risk identification, risk analysis, Severity Index and Probability Impact Grid en_US
dc.title Turnitin: Manajemen Risiko pada Proyek Gedung Bertingkat di Banjarmasin en_US
dc.type Other en_US