dc.contributor.author | Ghofur, Abdul | |
dc.contributor.author | Arifin, Faishal | |
dc.contributor.author | Subagyo, Rachmat | |
dc.contributor.author | Mursadin, Aqli | |
dc.contributor.author | Syarief, Akhmad | |
dc.contributor.author | Amrullah, Apip | |
dc.date.accessioned | 2023-04-10T20:33:44Z | |
dc.date.available | 2023-04-10T20:33:44Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://repo-dosen.ulm.ac.id//handle/123456789/28255 | |
dc.description.abstract | This paper compares the performance of a condenser during the period between August and December 2018 to that during the commissioning period. It belongs to the Steam Power Plant (PLTU) I in Central Kalimantan. The comparisons are carried out in terms of the load, LMTD, temperature efficiency, capacity ratio, and effective heat transfer coefficient. The overall results suggest that time evidentlytakesitstollontheperformanceastheUeffdecreasedfrom1980W/m2K during the commissioning to 1319,4 W/m2K in December 2018. Fouling is the main reason for this. | en_US |
dc.language.iso | en | en_US |
dc.publisher | MIMSE-M-E 2022 | en_US |
dc.relation.ispartofseries | AER 216;pp. 207-217 | |
dc.subject | Condenser · Ueff · Fouling | en_US |
dc.title | Analysis of C ondenser N-16000-2 U nit I PLTU I Central Kalimantan ( 2x60) MW | en_US |
dc.type | Other | en_US |