Repo Dosen ULM

Analisis Perbandingan Efisiensi Alat Pancang Diesel Hammer Dan Drop Hammer Pada Pekerjaan Pondasi Tiang Pancang Di Lahan Basah

Show simple item record

dc.contributor.author Yuliana, Candra
dc.contributor.author Kartadipura, Retna H.
dc.contributor.author Sari, Eva Puspita
dc.date.accessioned 2023-04-09T23:02:35Z
dc.date.available 2023-04-09T23:02:35Z
dc.date.issued 2021-10-28
dc.identifier.citation Candra, C. Y., K, R. H., & Sari, E. P. (2021). COMPARATIVE ANALYSIS OF EFFICIENCY OF DIESEL HAMMER AND DROP HAMMER PIECES ON PILE FOUNDATION WORK IN WETLAND. Jurnal Infrastruktur , 7(2), 87 - 92. https://doi.org/10.35814/infrastruktur.v7i2.1267 en_US
dc.identifier.issn 2540-9212
dc.identifier.uri https://repo-dosen.ulm.ac.id//handle/123456789/28069
dc.description.abstract The pile driving method requires the management of heavy equipment such as pile drivers as the main equipment for the construction of pile foundations. Pile driver productivity is very influential in terms of time and cost during implementation. Therefore, it is necessary to study the productivity of the pile driver by comparing the Diesel Hammer and Drop Hammer in a project. The driving work with Diesel Hammer tools produces a productivity of 17.98 m/hour, the total duration of driving is 21 points for 49 hours with equipment rental of Rp. 15.240.000,-. Meanwhile, with the Drop Hammer the productivity is 11.71 m/hour, the duration is 77 hours, the total equipment rental is Rp. 14,940,000,-. In terms of time and cost efficiency with a certain depth, there are significant time and cost differences between the two tools. Both pile drivers have advantages and disadvantages, but in terms of time and cost efficiency. Based on the time aspect, the Diesel Hammer is more efficient than the Drop Hammer, but it is necessary to consider the cost aspect. en_US
dc.publisher Fakultas Teknik Jurnal Infrastruktur Program Studi Teknik Sipil Universitas Pancasila en_US
dc.subject Diesel Hammer en_US
dc.subject Drop Hammer en_US
dc.subject Efficient en_US
dc.subject Productivity en_US
dc.title Analisis Perbandingan Efisiensi Alat Pancang Diesel Hammer Dan Drop Hammer Pada Pekerjaan Pondasi Tiang Pancang Di Lahan Basah en_US
dc.type Other en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account