Repo Dosen ULM

Tinjauan Analisis Risiko Keselamatan Proyek Konstruksi Pabrik Pengolahan Kelapa Sawit di Kalimantan Selatan

Show simple item record

dc.contributor.author Sutowijoyo, Hendro
dc.contributor.author Isramaulana, Aulia
dc.contributor.author Mudjanarko, Sri Wiwoho
dc.date.accessioned 2020-12-22T03:20:24Z
dc.date.available 2020-12-22T03:20:24Z
dc.date.issued 2020-11
dc.identifier.issn 2541-0318
dc.identifier.issn 2541-2884
dc.identifier.uri https://repo-dosen.ulm.ac.id//handle/123456789/18646
dc.description.abstract Increasing production based on a good analysis is absolutely necessary for a company that wish to increase revenue while at the same time strengthening their position in this competition era. As one of the largest palm oil processing companies in Indonesia, Sinar Mas Group has a plan to develop the production facility in Tarjun Village, South Kalimantan beside of new land for palm plantations in order to increase production yields. The development of production facilities is focused on the substructure firstly to ensure the reliability of the building that will stand on it. The method of construction is carried out by erecting the foundation onshore and offshore by a specialist contractor which appointed by the employer. The issues of safety risks that will arise became the main attention of employers and the contractor. The study aims to find out how much the safety risk of a factory construction project which includes of foundation at production facilities and factories which is carried out onshore and offshore by one of the specialist contractors in Indonesia. The risk management method starts with the identification, analysis, response and review of risks. Identification is carried out by documentation reviews and checklist analysis techniques on similar projects in the past on risk variables affecting the safety aspects that is carried out between employers and the contractor. The results of the analysis show that the potential danger variable of falling/slipping/rolling both tools/workers on the piling work at sea is the highest risk of danger followed by falling into the sea on finishing work as the next biggest potential hazard in a factory construction project in South Kalimantan. The mitigation efforts which is carried out are adjusted to the potential hazard variables, including paying serious attention to the cleanliness aspects of the project site as well as strict supervision the use of PPE by the personnel. en_US
dc.publisher Jurnal Agregat Universitas Muhammadiyah Surabaya en_US
dc.relation.ispartofseries 5;2
dc.subject project safety en_US
dc.subject risk management en_US
dc.title Tinjauan Analisis Risiko Keselamatan Proyek Konstruksi Pabrik Pengolahan Kelapa Sawit di Kalimantan Selatan en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account