Repo Dosen ULM

Model Of Land And Forest Rehabilitation Efforts In Amandit Sub Sub Watersheed

Show simple item record

dc.creator Ruslan, Muhammad
dc.creator Fithria, Abdi
dc.creator Budi, Setia
dc.creator Syam’ani, Syam’ani
dc.date 2018-02
dc.date.accessioned 2020-06-15T04:00:09Z
dc.date.available 2020-06-15T04:00:09Z
dc.identifier http://eprints.ulm.ac.id/3995/1/Syam%27ani%20-%20IJFSE%202018.pdf
dc.identifier Ruslan, Muhammad and Fithria, Abdi and Budi, Setia and Syam’ani, Syam’ani (2018) Model Of Land And Forest Rehabilitation Efforts In Amandit Sub Sub Watersheed. International Journal of Forest, Soil and Erosion (IJFSE), 2018. ISSN 2251-6387
dc.identifier.uri https://repo-dosen.ulm.ac.id//handle/123456789/11584
dc.description The increasing rate of deforestation leads to increased critical land in forestry, which leads to national critical lands. One of the areas that are critical of the critical land is the Sub-Sub Amandit of Hulu Sungai Selatan Regency. Efforts to rehabilitate forests and critical land can be made with approaches to empirical equation modeling, spatial land modeling and land cover simulation. Formulation of forest and land rehabilitation (RHL) model in a watershed should consider the problem of land criticality (TKL) and socioeconomic aspects. Formulation of the model refers to data obtained through the process of observation and interview. The result of the research before the simulation was done TKL there were 5 classes, that is: Not Critical (TK) 20,51 Ha, Critical Potential (PK) 18.786,44 Ha, Rather Critical (AK) 20.947,31 Ha, Critical (K) 10.062,31 Ha and Very Critical (SK) 105.60 Ha. The value of TP 0.88, (TP <1), means that the carrying capacity of the land can still accommodate more farmers. DASE value 41.64, means support for RHL activities very strong. Extensive model of RHL efforts in Amandite Upper Sub Watershed 15.193.52 Ha and the middle Section 15,922.37 Ha. In addition, there was also a decrease in the TKL as a result of simulation of land cover on RHL model above, where there were 5 TKL classes changed into 3 TKL classes, that is TK 20,51 Ha, PK 30,624,51 Ha and AK 19.27781 Ha. Keywords: Deforestation, National Critical Land, Land And Forest Rehabilitation Efforts Model, Sub-Sub Amandit of Hulu Sungai Selatan Regency
dc.format text
dc.publisher Universitas Lambung Mangkurat
dc.relation http://eprints.ulm.ac.id/3995/
dc.subject SD Forestry
dc.title Model Of Land And Forest Rehabilitation Efforts In Amandit Sub Sub Watersheed
dc.type Article
dc.type PeerReviewed


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account